VSP-G1 User Manual

From VSPARTICLE - Docs

This is the comprehensive User Manual for the VSParticle Generator One Spark Generator (VSP-G1). The Quick Start Guide is available as a quick reference for standard operation of the VSP-G1 unit.

After completing the User Manual, cross-check the residual risks requirements...if any changes are made to information in the residual risks table (8.5), make sure the corresponding changes are made in the design document.


Company VSParticle B.V.
VSParticle Generator One
Address Molengraaffsingel 10
2629 JD
Delft
The Netherlands
Website vsparticle.com
Support e-mail support@vsparticle.com

Introduction

top
EDIT for content when the manual is finished. Advanced editing: Refer to company website for consistency in language and terminology.

The User Manual provides instructions for the set-up, installation, operation and maintenance of a VSParticle Generator 1 ("VSP-G1") unit.

Alert Warning: Before operating the VSP-G1 unit, please read—and understand—this manual.

Wherever a caution CAUTION symbol is affixed to the machinery, there are explanatory texts located within the manual (see this section of the detailed system description for a guide to all symbols found on the VSP-G1. ). Other important safety information located within the manual are also labelled with the caution CAUTION symbol.

You will also find conformity and warranty information at the very end of this user manual.

A Quick Start Guide is also included for faster set-up as part of the standard operating procedure. For more information regarding safety, more complex operations and troubleshooting and maintenance, refer to this manual first!

If you have any questions or concerns regarding the VSP-G1 unit you have purchased or any information within the provided user documentation, please contact us via the contact details at the top of this page.

VSParticle Generator One

The VSP-G1 is designed for use by researchers who want to produce inorganic nanoparticles from conductive materials for applications in fields ranging from cluster research to materials science. The VSP-G1 is a desktop spark generator that uses spark ablation technology to produce aerosol nanoparticles after a high voltage spark evaporates part of two metallic electrodes. Its design is aimed at making the production of nanoparticles as simple as possible, while giving you the flexibility to customise the system by having control over:

  • particle size (1 atom to 20 nm)
  • ablation rate (~0.01-100 mg/h)
  • carrier gas
  • electrode material
  • gas flow rate (1-30 l/min)


It is also possible to customise the reactor by changing configurations from through flow (the standard configuration offered with the basic VSP-G1 unit) to cross flow, co-flow and combined configurations. The portability of the system also allows it to be integrated into a larger system for more complex operating procedures.

The VSP-G1 is designed as a continuous source of aerosolized nanoparticles for use in a controlled process system. This controlled process system typically comprises a gas source, a gas-tight system of unit operations, valves and tubing, and a gas exhaust fitted with one or more particle filters. Typical conditions in the process system are room temperature and ambient pressure. The system can be run at slight over- or under-pressure.

The closed system provides a safer production of nanoparticles and can easily be dismantled for safe transport of produced nanoparticles and for system cleaning and maintenance, which can be performed following a simple and fast protocol. The closed system design also allows you to produce high purity nanoparticles without any polluting by-products. The spark ablation process eliminates the use of any chemicals, surfactants, precursors or polymers. Without the need to rely on external materials to stabilise the produced particles, you have more flexibility to choose a suitable deposition system for the aerosol nanoparticles. The three physical principles to inmobilize the nanoparticles on a support are diffusion, impaction and electrostatic precipitation. If you have any questions or need help with the selection and/or development of a system that best fits your needs, please contact us.

For more information about the spark ablation process and possible applications, refer to the Background information section.

System and operator safety

top

Notification: To view a list and description of all warning labels found on the VSP-G1 unit, go to the Guide to symbols found on the VSP-G1

The risks associated with a spark generator can be divided into two categories: those associated with the machine itself, and those associated with nanoparticles. Machine-related risks are more widely regulated by international norms, such as the European conformity system required for marking certain products with the CE symbol. However, synthesized nanomaterials are relatively new and their quantum effects are still being studied, thus there are less standardized measures in place. Until more is known about nanoparticles, we apply the Precautionary Principle, treating them as potential highly toxic materials. The safety measures we employ for working with, storing and transporting nanoparticles have been drawn primarily from those designed for fine particles.

Safety of machinery

The VSP-G1 spark generator comprises general electronics (<50 V), gas connections and high voltage (6 kV), as well as moving parts. Several safety mechanisms mitigate the risk for damages and incidents related to potential equipment failure, but primary responsibility for correct and safe operation lies with you as the operator of the system. The VSP-G1 is intended for use by qualified personnel only.

Operator safety actions

You are required to ensure that:

  • the reactor is correctly mounted (see Flow configurations);
  • there are no objects near the electrodes (see Flow configurations);
  • process connections are correctly made (see Process connections);
  • the pressure in the system is limited to ±0.2 bar (see Process connections);
  • all, if any, external safety systems are functional (where applicable); and
  • personal protective equipment are being used correctly (gloves, glasses, and FFP3/P3 certified filter mask).

Existing protective features

Alert Warning: Intentional misuse of the VSP-G1 in a manner not specified by VSParticle may impair the existing protective features.

The VSP-G1 is equiped with an interlock system. When a failure is detected, the interlock system cuts power to the high voltage supply and the motor, shutting down particle production. There are three types of interlock.

  • Internal Interlock.

During start-up and while running, the VSP-G1 the control system checks if internal systems are working properly. If any check fails an internal interlock is triggered. When the interlock cuts power, you must first fix the conditions that caused the interlock to activate before clearing the interlock state. Press and depress both dials simultaneously to clear the interlock.

  • Reactor interlock.
The mounting pin is used both to secure the reactor assembly, and to close the interlock protection.

The VSP-G1 detects whether the reactor endcaps are properly mounted, using two mounting pins (see image). You must ensure that the reactor itself is correctly assembled. In short, this means that the reactor is leak tight (see Leak tightness protocol) and that the gas inlet valve and electrode tips are free to move with a minimum clearance of 10 mm from any foreign objects (see Flow configurations).

Alert Warning: Gas connections and other user-provided functions are not controlled by the interlock. An optional external interlock is available for the VSP-G1.
  • External interlock. (option)

An external interlock switch can be provided for incorporation in an external safety system. To allow operation, two pins of the interlock connector must be connected (shorted). Breaking the connection switches the system into interlock mode.

Other residual risks

Pressure. Pressure within the closed system poses a serious risk when improperly handled. Increased pressure can be caused by unintentional release of gas at high pressure, the closing of output valve while the input valve is open, clogged filters, spark obstruction, or a full deposition system. Exceeding the maximum pressure can lead to failure of the gaskets and seals, and the viewport could explode.

Non-ionizing radiation. The spark plasma emits a bright light in the visible and UV range. A viewport with a removable optical filter is included to allow visual inspection of the electrodes. Additionally, electromagnetic radiation (radio frequency) may be emitted.

Notification: See Residual risks for a comprehensive list of residual risks and how they are mitigated through design features and/or documentation.

Safety of nanoparticles

Because our spark generators can in principle be used to produce nanoparticles from any metal, we start from the assumption that these nanoparticles pose potential risks to the health of operators, consumers and to the environment. This manual addresses operator exposure. Consumer exposure is determined by the application in which the nanomaterials are to be used and should be evaluated on a case-by-case basis by the user. Environmental considerations should also be addressed by the operators with a life cycle analysis.

The main channels of operator exposure to nanoparticles are through (skin) absorption, ingestion and inhalation. The aerosol nature of the produced nanoparticles by the VSP-G1 system means exposure through inhalation is the main risk. The respiratory system of the human body has natural defenses in place for airborne particles such as dust, viruses and bacteria. However, nanoparticles are able to bypass most of these defenses due to their small size. For this reason, nanoparticles are treated in the same way as fine particles. More information on health and safety of nanoparticles can be found through the links at the end of this section.

Operator exposure

While the VSP-G1 unit is designed to be a closed system to maximize safety when working with nanoparticles, there will be situations in which it will be necessary to open the system, including routine maintenance activities, replacement of electrodes and filters, and sample extraction. The list below also includes some possible situations in which the operator may be inadvertently exposed to nanoparticles and a brief summary of the necessary precautions to prevent, wherever possible, such situations.

Exposure risk situation Operator precautions
Gas phase exposure An aerosol system must be leak tight from source to deposition (see Leak tightness protocol).
Filtration The gas exhaust should be treated with a suitable HEPA or ULPA filter. VSParticle recommends using a large capacity HEPA pre-filter, followed by an ULPA end filter.
Dealing with pyrophoric materials Metal nanoparticles can be extremely reactive, and can be pyrophoric (spontaneous ignition upon exposure to air).Controlled air-exposure, however, is needed before opening the system in order to passivate any reactive materials (see Controlled-air exposure protocol).
Product handling When the system must be opened to insert or remove a substrate, methods as described in the maintenance protocols section must be followed to reduce the risk of nanoparticle exposure.
Maintenance Nanoparticles will collect on the surfaces inside the reactor and downstream piping. Cleaning of these surfaces presents the largest exposure risk to operators, unless they can be performed in a safe environment (e.g. a glovebox) (see System care for the relevant maintenance protocols).


There is also a separate protocol for dismantling and sealing used filters for disposal/recycling, which is largely dependent on your particular filtration system (see Filter replacement in the maintenance protocols section).

Links to more information on nanoparticles and health

System description

top

What's in the box

Congratulations on your purchase of the VSP-G1!

In the box you will find the following:

You will also find a Quick Start Guide for daily operation and a reference card for working with nanoparticles in the lab. If there's anything missing or looks damaged, contact us immediately at support@vsparticle.com or using the contact details at the top of this page! A damaged power supply cable may temporarily be replaced by a similar cable, but ensure it has a functional protective earthing terminal.

Detailed system description

A visual reference and detailed description of the components that are part of the VSP-G1 system is provided on the Detailed System Description page. This includes a full reference of the warning labels and symbols found on the machine.

Setting up

top

Setting up the base unit

Alert Warning: When conducting activities requiring an open reactor, ensure that:
  • The power is off and the power supply has been disconnected;
  • There is no gas flowing through the system;
  • You are wearing safety equipment, including gloves;
  • The reactor assembly has been moved to a safe environment before it is opened (unless handling for the first time); and that
  • The internal pressure has been equalised (unless handling for the first time).
Alert Warning: Do not open the base unit. There are no user serviceable parts inside.
Front view of the VSP-G1 base unit
Place the base unit on a flat surface, ensuring sufficient space around the sides and back of the unit for gas, power and communication connections.

Do not connect the system to a power supply until everything has been properly assembled.

Mounting the reactor assembly

Alert Warning: Under no circumstances mount the endcaps onto the base unit without a sealed reactor.

When shipped, the reactor assembly is attached to the transport plate in the packaging. The electrodes have already been installed. In the case you want to replace the electrodes, please see the electrode replacement protocol in the System care section of this manual.

Step Description Picture
1. Unscrew and remove the alignment pins holding the reactor assembly to the transport plate.
2. Holding the endcaps in both hands, carefully transfer the reactor assembly to the mount plate located at the top of the base unit, aligning the markings on the bottom of the reactor assembly's endcaps and the mount plate.
3.

Lower the reactor assembly gently and allow it to slide into position.

4.

Use gentle pressure to ensure the reactor assembly is fully pressed down.

5.

Insert the alignment pins and tighten.

To confirm that the reactor assembly is correctly assembled, use a digital multimeter (DMM) to measure the resistance between the reactor chamber and the ground point on the back of the system. Image needed. The resistance should be <0.1 Ohm.

Building a simple setup

Your customised setup

Your particular deposition requirements and research needs will result in a system setup that is different from others. In all cases, however, the following requirements help ensure that the system works efficiently and safely:

  • Working system that allows compartmentalisation of the reactor and the deposition system;
  • Gas pressure monitoring tool;
  • Deposition system; and
  • Safe exhaust (fume hood with HEPA+ filters, for example) for the outflowing gas.


A guide to a reference setup is available to help designing basic setup that fulfills these requirements on the VSP-G1 Reference setup page. Move to Reference setup page

A simple setup connecting the input gas source and flow system to the particle source, deposition system, filtration system and the ventilation system.

The following basic operating procedure is for a simple setup pictured below, which comprises several operating units: a gas source and flow system, a particle source (the VSP-G1 unit), a pressure gauge, a deposition system and exhaust filters. To complete the setup, the units are connected with tubes, piping, fittings, valves and so on. The ball valves () in this setup help compartmentalize the overall system for leak testing and for safe disconnection. Each setup will be different, depending on your individual needs, but the concepts described here should generally be valid.

To reduce particle losses, please take the following guidelines into account:

  • Keep the tubing length between particle source and deposition system as short as possible to reduce diffusive losses.
  • Use conductive tubing (metal or conductive polymer) in particle carrying lines to reduce electrostatic losses.
  • Do not use flow controllers (e.g. needle valves, mass flow controller) in particle lines, as particles will clog up the controller.
    • Usually the controller can be placed in another (particle free) line, or downstream of the deposition system, behind a filter.
    • If flow control is absolutely needed in a particle line, use an orifice.
  • Avoid constrictions that can function as a particle trap. I particular:
    • Use ball valves with a wide bore.
    • Avoid fibers and meshes.


TC: IS THERE A CODE FOR AUTOMATICALLY RESIZING THE IMAGE BASED ON BROWSER SIZE? USEFUL FOR OPERATORS ACCESSING MANUAL USING TABLETS IN THE LAB


Building a setup takes three steps:

  1. Design/draw/sketch your flow diagram, including sensors, valves and filters.
  2. Assemble the VSP-G1 (see Assembling the system
  3. Assemble the rest of the setup according to your flow diagram.
  4. Check the system for leak tightness and make adjustments if necessary. (See Checking for leaks.)

Compartmentalisation

Compartmentalisation of the setup.

For safety reasons, we recommend compartmentalisation of every unit within the setup that regularly opens up to the atmosphere to allow for easy dismantling in a safe manner. In the setup described here, we use two valves on both sides of the deposition chamber which allows us to easily seal off both the reactor and the rest of the setup. When the deposition chamber is removed, it can be safely transported to a safe working location, such as a fumehood or glovebox, in order to take out the sample. Meanwhile, the rest of the setup, which often contains a significant amount of nanomaterial, remains safely sealed.

Flow configurations

content needed

Alert Warning: Do not use a rigid gas connection on the gas inlet valve. You can damage the reactor if the valve is not free to move during the homing sequence.

Process connections

Alert Warning: Important notes about carrier gases:
  • Do not use reactive gases, in particular gases containing more than a few percent oxygen, such as air.
  • Do not use heated gases.

Here, we'll discuss a simple set-up using one inlet and outlet using Swagelok connectors. On this page you'll find much more information on the available configurations and connections.

Pressure safety

Alert Warning: Do not exceed +1.2 bar absolute. Do not turn on the spark below 0.8 bar.

The internal pressure should not exceed +1.2 bar or there is an increased risk of failure of the gaskets and/or seals in the reactor, causing leaks and risk of nanoparticle exposure. A build-up of pressure within the system might be an indicator of obstruction, either within the reactor, the deposition system or in the filtration system. Ideally, a pressure sensor at the reactor inlet is used to automatically switch off the gas supply. Stop spark production and gas flow immediately when pressure reaches +1.2 bar to determine the source of obstruction and resolve the issue. See System care for cleaning procedures.

Checking for leaks

Alert Warning: The leak tightness protocol is an essential part of the operating procedure before initiating particle production. Failure to test for leak tightness, improper installation/removal of blindcaps or lack of external monitoring tools could mean the total output of the system—that is, up to 100mg/h of nanoparticles—is released continuously to the operator.

Electronic connections

Grounding the system
The spark generator uses the ground from the mains plug for safety. Use only certified cables and properly wired wall outlets. The separate functional earth terminal on the back of the base unit (#21 in the base unit back diagram above) is internally connected to the mains connector ground, and should be independently connected to the protective ground in the case a recommended mains power supply plug is unavailable.

Alert Warning: Failure to sufficiently ground the VSP-G1 unit can result in exposure to lethal voltages.

Power supply connection
After assembling the base unit and reactor, plug in the provided mains cable into the mains inlet and connect the VSP-G1 to a mains outlet (110-230VAC).

Communication The VSP-G1 comprises a female 9-pin sub-D connector.

Pin Purpose
2 Tx (output)
3 Rx (input)
5 Common
Unassigned pins are not connected.

Final set up checklist

Content needed (including ensuring that the system is grounded) move to operation?

Operating the system

top

Alert Warning: Please read the entire Basic operating procedure before operating the VSP-G1!
Alert Warning: Do not handle or open the system while particles are being generated and while gas is flowing.

Controls

Manual control

content needed The VSP-G1 can be controlled directly from the front panel. The two dials on the front panel can be pressed to select a function, such as changing a set point. Turn a dials to change its associated value, and press it again to confirm its associated value. Press the start button on the front panel to start or stop the spark generator. The integrated LED indicator of the start button lights up red when the system is idle. During operation, or if an error is detected, the LED starts blinking. Press and depress both buttons simultaneously to access the Setup menu.

identification and description of operating controls and their use in all operating modes (Start/stop button Voltage dial Current dial Display) in separate page or at [VSP-G1_Detailed_System_Description|system description]

Alert Warning: Do not open the system while it is being operated remotely.

Remote controlled operation

The VSP-G1 can be controlled remotely via its RS232 interface at the back of the system. Communication settings are 9600 baud, 8 bit, no parity, no flow control. A full discussion of the command structure, functions and limitations can be found in the Remote control guide.

Basic operating procedure

An abridged form of this section is also available as a Quick Start Guide.
reference to other protocols?

Preparation

  1. Ensure that the system is leak tight.
  2. Power up all systems.
  3. Ensure that the path to the exhaust is clear.
  4. Start gas flow.

Start nanoparticle production

  1. Set target voltage and current using the dials on the front of the VSP-G1 base unit.
  2. Press the start button to begin nanoparticle production.
  3. To stop production, press the start button again.
  4. It's possible to adjust the particle output by changing the voltage and current settings. Higher voltage and current leads to larger particles.

We recommend leaving the system to equilibrate/stabilise for 15-30 minutes, depending on your specific needs. This time allows the system to warm up, and the surface of the electrode tips to be refreshed and removing, if any, surface oxides.

Shutting down

  1. Stop particle production.
  2. Select Shutdown in the menu, and press 'OK'.
  3. Turn off the mains switch.

Opening the system

Four valves, two on each side of the deposition system have been closed to contain it for removal from the setup. When removing the deposition system, the contaminated surface that the operator can be exposed to is reduced to the volume between the valves.

Common reasons to open the system are to place or remove a sample/substrate, to clean the reactor, or to change electrodes. To reduce the risk of exposure when handling non-immobilized nanomaterials, it's recommended to open the system in a controlled working environment. If the deposition chamber is not equipped with sufficient protective measures, it can be convenient to move the deposition chamber itself to a fume-hood or glovebox (see image).


Steps required before stopping production:

  1. Stop particle production.
  2. Flush the system (see Flushing the system).
  3. Stop the gas flow.
  4. Take out your sample following the procedure for your deposition system, taking the necessary precautions to prevent/reduce exposure to nanoparticles. Pay special attention when handling potentially pyrophoric nanoparticles.

Miscellaneous operating protocols

Leak tightness protocol

Testing for leak tightness is an essential part of preparing the system for particle production to optimise safety and minimise unnecessary exposure to nanoparticles.

Step 1: Closing the system before starting the leak tightness protocol.
  1. After checking the flow connections, ensure that the pressure gauge is turned on (and functioning). Close the system (see diagram of a sample setup below), and slowly turn on the gas flow. When the system reaches +0.2 bar overpressure, switch off the gas supply. The internal pressure should remain the same. If system pressure drops more than a few millibar over the course of 10 minutes, there is a leak in the system, and you should proceed to step 2. If the system is leak tight you can proceed to "Start nanoparticle production".
  2. To narrow down the location of the leak, you can perform the leak test of step 1 on a sub-section of the setup (compartmentalization). In the basic setup, we use ball valves for this purpose. The schematic to the right shows a sub-section with the VSP-G1 unit (our particle source). Note that the pressure gauge must be part of the isolated sub-section. Check for leaks in the same way as step 1.
    'Step 2: Partial compartmentalization of the particle source to check for leak tightness.
  3. To resolve the leak, check the process connections within the leaking (sub-)section. Make sure the process connections are correctly made according to manufacturer specifications. Tighten the connections and/or replace the tubing wherever necessary. Leak-detecting spray may be useful to identify faulty process connections, but should not be used on the reactor assembly or base unit.
  4. Repeat these steps for every enclosed section (see diagram below) of the setup until the system is leak tight. If leaks persist, check the proper installation of the pressure gauge connections; contact VSParticle if you suspect a leak occurs within the reactor assembly itself.
  5. After resolving the leaks found in the previous steps, repeat the leak tightness test of step 1 on the whole system. If the system passes, it is ready to start nanoparticle production.

Controlled-air protocol

Alert Warning: Small metal nanoparticles can be extremely reactive. Spark-generated particles made in clean gases can be pyrophoric, presenting a risk of fire when suddenly exposed to air.

content neededgradually introduces small amounts of air to stabilize the system before opening

Flushing the system

Notification: Flushing the system greatly reduces the risk of nanoparticle exposure when opening the unit for any reason.

To reduce risk of operator exposure, the system should be flushed before opening. The easiest way to flush is by flowing gas with the spark switched off. The time required to flush the system depends on residence time ,


the volume of the system (operating volume of the VSP-G1 is approximetly 0.3 l), and the flow rate . As a general guideline, one should flush the system for at least 9 times the residence time. With a flow rate of 1 l/min, this takes about 3 minutes.

System care

top

Alert Warning: Important points to remember when conducting maintenance activities involving disassembly and reassembly:
  • Turn off the spark generator and disconnect it from the power supply;
  • Transport the reactor assembly with the transport plate and open it in a safe environment;
  • Do not apply pressure when wiping the surface;
  • The coating on the viewport filter screens electromagnetic radiation. Do not scratch the coating, nor replace it with a different type;
  • Dry all surfaces before reassembly;
  • Retract the electrodes sufficiently to avoid collision with each other; and
  • Screw down both reactor mounting pins.

When to clean the reactor and replace the filter(s)

Clean the reactor whenever you replace the electrodes, the reactor is dirty, or after 100-1000 hours of operation (which in turn depends on your operating conditions: if making more particles, clean more often). If higher settings are needed to maintain a spark flow, it is possible that the reactor needs to be cleaned to prevent spark obstruction which can possibly lead to spark misfiring within the reactor system. If the pressure within the system increases even with the valves open, it is possible that the filter is full and needs to be replaced.

Maintenance protocols

TVP and Vincent: consider adding how-to videos

There are several maintenance protocols for the VSP-G1. Although the system requires no regular maintenance by the end user, cleaning the reactor periodically is recommended, especially after a change of electrode material. To prevent exposure to nanoparticles and to ensure safe and efficient cleaning, follow the protocols set out in the Maintenance protocols section. The procedure to replace electrodes is also discussed there.

Safe handling and storage

content needed The VSP-G1 is a scientific instrument, and must be handled with care. This section provides general guidelines on how to safely handle and store the system. Detailed methods are described in section Maintenance protocols.

Disassembly

The base unit with reactor installed has a combined weight of 22kg. For general handling, e.g. when assembling a setup, the reactor is conveniently be transported separately from the base unit. A mount plate / transport tool is provided for this purpose. See Unmounting the reactor assembly.

General disposal guidelines

Disposal of nanomaterials

Label and dispose cleaning materials contaminated with nanomaterials according to local rules and regulations. See also Filter replacement and Disassembling and cleaning the reactor.

Retiring the VSP-G1

Local regulations and practices apply for disposal of electronic equipment. If the VSP-G1 has reached end of life, please contact VSParticle at support@vsparticle.com for recommendations on how to dispose of the system.

Transportation, packaging and storage

VSParticle recommends using the original packaging for transportation and shipping. Be sure to [[VSP-G1_Maintenance_protocolsl#Disassembling and cleaning the reactor|clean the reactor] before shipping the reactor. The system should also be cleaned if it is not to be used for a longer period of time.

When shipping the system to VSParticle or one of it's representatives for any reason, return authorization (RA) is required. Contact your distributor. For systems supported by VSParticle, a RA form can be provided by VSParticle. Vincent, graag aanvulling

Troubleshooting

There are several possible issues that may arise during normal operation of the VSP-G1. A more thorough description of all error codes and ways to resolve these are listed in the Troubleshooting guide.


Glow mode

Occasionally the spark voltage drops suddenly, and a weak arc may be seen between the two electrodes. This is caused by a too high charging current. If this occurs directly after changing the spark voltage or spark current set point, the control system in the VSP-G1 will likely correct the situation. If not, the chosen set point cannot be maintained in spark mode. Increase the spark voltage or decrease the operating current to correct the situation.

Interlock errors

Message on display Cause Resolution
Interlock err. 7 Motor controller failure The motor controller reports a failure. This can be due to:
  • A blocked motor. Follow the instructions described on the Maintenance protocols page to dismount and disassemble the reactor. Then, verify that the electrode is free to move by manually rotating the gear located at the underside of the left end cap. Assemble and remount the reactor ensuring some space exists between both electrodes and power on the VSP-G1 to try again.
  • Motor controller communication interference or failure. Press both dials to clear the error and try again. Optionally, switch the machine off and on again. If the error persists, contact VSParticle.
  • Motor controller failure. Press both dials to clear the error and/or switch the device off and on again. If the error persists, contact VSParticle.
Interlock Error 8 Broken interlock switch One of the interlock switches is broken or has a broken connection. Verify both reactor mounting pins are properly secured and that the reactor is properly mounted on the base unit. Press both dials to clear the error and try again. If the error persists, contact VSParticle.
Interlock Error 9 Open interlock switch One or more interlock switches are in the open state. Verify both reactor mounting pins are properly secured and that the reactor is properly mounted on the base unit. Press both dials to clear the error and try again.

Electrode alignment

When the VSP-G1 starts aligning electrodes during start-up, several sounds may be heard:

  • Quick hammering. This occurs occasionally when the electrode is in an unusual position (e.g. after maintenance/cleaning of the reactor has been performed) and cannot move in the expected direction. This is normal. The sounds should not last more than a second and the system corrects itself and completes the alignment procedure. If the sounds persist for more than a few seconds, switch off the VSP-G1 using the main power switch at the back. Follow the instructions for a blocked motor found under the Interlock err. 7 entry of the interlock errors section above.
  • Clicks. These occur at the boundaries of the adjustment range and are no cause for concern.
  • Vibrations or rattling. This can occur when there is tension on the gas inlet of the left end cap, restricting free movement or due to wear of the transmission. Check that the gas inlet is free to move. If these sounds occur regularly, contact VSParticle.


When the electrode alignment sequence fails, this is displayed as Interlock err. 7. Refer to the interlock error section above for possible resolutions.

Further troubleshooting

Refer to the Troubleshooting guide for further troubleshooting your VSP-G1.

When to contact VSParticle

  • If the system keeps reverting to interlock without apparent reason.
  • If sparks can be heard or seen in any location other than between the electrode tips.

Accessories and replacement parts

top

Use only VSParticle approved parts. All parts related to the reactor assembly must be examined and/or supplied by VSParticle. Contact us for more information.

Specifications of replaceable parts that can be obtained by other suppliers:
Fuses - The fuse holder accepts 5x20mm T2.5A/250V fuses.
Power cable - IEC-content needed.
RS-232 cable - any standard RS-232 cable is suitable.

Appendices

top

VSP-G1 technical specifications

Additional information about the VSP-G1 operating window, electrical specifications and output can be found on the Technical Specifications page.

Environmental Conditions

The VSP-G1 is designed to be safe under the following normal environmental conditions:

  • Indoor use;
  • Altitude up to 2,000 m;
  • Temperature 5 °C to 40 °C;
  • Maximum relative humidity 80 % for temperatures up to 31 °C decreasing linearly to 50 % relative humidity at 40 °C;
  • Mains supply voltage fluctuations up to ±10 % of the nominal voltage;
  • Transient overvoltages up to the levels of overvoltage category II;
  • Temporary overvoltages occurring on the mains supply; and
  • Pollution degree 2.

Protocol index

This section has been commented out. Use edit to view old content.

Residual risks

This section has been commented out. Use edit to view the original table.

EC Declaration of Conformity

top
version for user documentation does not need to show signature nor serial number

Warranty

top

Warnings

Note: I left all of the warning labels from the original draft of the user manual. Not all have been inserted into the document itself. These can be edited for an "Important Safety Guidelines" document to be shipped with the new VSP-G1 unit. - Kate

All warnings hidden for now, please use edit to view the commented section.