VSP-G1 Quick Start Guide

From VSPARTICLE - Docs

This is the Quick Start Guide for standard operation of a VSP-G1 unit. For first time operators, detailed information or troubleshooting, please refer to the User's Manual.


Standard Procedure

Pre spark procedure

  • System is leak-tight
  • An appropriate filter has been installed (HEPA or better)
  • Overpressure protection is in place and functioning
  • Check that all electrode connections are ok
  • Make all the necessary modifications and settings (confirm this is correct with Tobias)

Post spark procedure

  • Stop particle production
  • Flush system (9x of the system volume)
  • Close off gas source
  • Contain the (to be) exposed area

Retrieving the produced nanoparticles

Standard Configurations

Maintenance

Contact information