VSP-G1 Quick Start Guide: Difference between revisions
From VSPARTICLE - Docs
m (K.groves moved page G1 Quick Start Guide to VSP-G1 Quick Start Guide) |
No edit summary |
||
Line 2: | Line 2: | ||
== | == Standard Procedure == | ||
'''''Pre spark procedure''''' | |||
* System is leak tight | |||
* An appropriate filter has been installed (HEPA or better) | |||
* Overpressure protection is in place and functioning | |||
* Check that all electrode connections are ok | |||
* Make all the necessary modifications and settings <span style="background:#FFFF00">(confirm this is correct with Tobias)</span> | |||
'''''Post spark procedure''''' | |||
* Stop particle production | |||
* Flush system (9x of the system volume) | |||
* Close off gas source | |||
* Contain the (to be) exposed area | |||
'''''Retrieving the produced nanoparticles''''' | |||
== Standard Configurations == | == Standard Configurations == |
Revision as of 13:26, 22 September 2016
This is the Quick Start Guide for standard operation of a G1 unit. For first time users, detailed information or trouble shooting, please refer to the User Manual.
Standard Procedure
Pre spark procedure
- System is leak tight
- An appropriate filter has been installed (HEPA or better)
- Overpressure protection is in place and functioning
- Check that all electrode connections are ok
- Make all the necessary modifications and settings (confirm this is correct with Tobias)
Post spark procedure
- Stop particle production
- Flush system (9x of the system volume)
- Close off gas source
- Contain the (to be) exposed area
Retrieving the produced nanoparticles